JUMAG Skid Mounted Units
Also available for hire
JUMAG Skid Mounted Units: Plug and Steam
Simple installation
- Ready for connection and optimally tubed – this avoids installation errors
- Minimal space requirements
- Base plate optionally divisible for transport, installation and assembly
Safe and economical
- All components (steam boiler, water treatment, blow down vessel) are perfectly matched with each other. This increases and extends optional reliability and minimises operating costs.
- A skid mounted unit can be installed very quickly and is often less expensive than the classic on-site installation of a steam system
- JUMAG skid mounted units with steam boilers from the DG series do not require approval or monitoring in many countries (including Germany)
- All Jumag systems can also be rented
Flexible
- JUMAG skid mounted units can be supplied with oil- or gas-fired steam boilers or with electric steam boilers
- Multiple units are also available as skid mounted units
- Will your steam requirements increase in the future?
Versions of the skid mounted units can be expanded in the future by connecting additional steam boilers
Basic equipment
- All components required for steam generation, such as steam boiler with economiser, feed water container, dosage pump and blow down vessel, are mounted on a frame to save space
- Good accessibility for maintenance despite the compact design
- Also possible as multiple unit steam system
- Flexible as an oil- or gas-fired system, or in hybrid operation with electrically operated steam boilers
FAQ
No. It applies to combustion units from 1MW and is therefore not relevant for JUMAG, not even for multiple units.
Our steam systems are typically used for process steam generation. Therefore, these regulations only apply to our steam boilers if they are used exclusively for heating purposes or hot water generation.
Please contact our service department for this. We will be happy to provide you with a quote that explicitly mentions the delivery time and availability. Normally you can expect 5 business days. We keep many components in stock for 10 years and longer.
No. None of our steam boilers require a boiler house. Not even as a multiple unit steam system.
Yes. Modernisation, expansion and new construction are eligible, e.g. the replacement of a steam boiler if the new steam boiler is more efficient.
A subsidy rate of up to 40% is possible. Contact us and we will be happy to support you.
Yes. It is only important to know the final stages of construction in advance so that we can design the vessels accordingly beforehand. Afterwards, you can easily expand the steam system at your pace.
From 2 to 4 tonnes of steam demand per hour, JUMAG makes sense under the following conditions:
- You expect different load peaks
and/or - You need redundancy
and/or - You have decentralized steam consumers
The important thing here is the quality standard of the steam that you actually want to achieve. Steam qualities up to pure steam are possible. If you need higher qualities, we should consider a special solution. JUMAG has solutions for this as well.
We work together with Weishaupt as standard. With Weishaupt gas burners, operation between burner low and high load is possible in increments up to 35%. The oil burners operate in two levels, with automatic high and low load operation.